BKR Baker Hughes
Gas-and-power mix shift is real but already priced; fair value near today's price.
The story
Baker Hughes is a two-segment energy technology firm. Oilfield Services & Equipment is a mature, cyclical business, while Industrial & Energy Technology (gas turbines, LNG compression, power generation for data centers) is the growth engine with a multi-year backlog. The firm is moving from a mature cyclical services player toward a gas-and-power equipment franchise, and the margin gains come from that mix shift and cost discipline rather than from volume growth.
I kept all the drivers from last time. TTM revenue of 28.74B (about 3.6% above the last fiscal year) and a 12.5% TTM margin are consistent with the previous story. They do not justify assuming IET's 20% target margin across the whole firm, so the blended target stays at 15.5%, reflecting the mix shift with OFSE held near cycle-average margins. Sales-to-capital stays at 1.4, above the 1.15 historical figure, because the backlog-heavy IET work is funded partly by customer advances. The 8-year horizon matches a moat that is real but cyclical.
Value drivers
| Revenue growth (Y1) | 3.0% |
| Terminal growth | 2.5% |
| Forecast horizon | 8y |
| Target operating margin | 15.5% |
| Years to target margin | 5 |
| Sales-to-capital | 1.40 |
| Beta | 1.10 |
| Failure probability | 1.0% |
| Cost of capital (WACC) | 9.5% |
| Terminal WACC | 9.1% |
Valuation bridge
| PV of explicit FCFF | 20.03B |
| PV of terminal value | 30.90B |
| Equity value | 47.90B |
| ÷ shares → per share | $48.23 |
Projected free cash flow to the firm
| Yr | Revenue | Growth | Margin | NOPAT | Reinvest | FCFF | PV |
|---|---|---|---|---|---|---|---|
| 1 | 29.60B | 3.0% | 13.1% | 3.54B | 615.86M | 2.93B | 2.68B |
| 2 | 30.47B | 2.9% | 13.7% | 3.81B | 619.23M | 3.19B | 2.67B |
| 3 | 31.34B | 2.9% | 14.3% | 4.09B | 621.82M | 3.47B | 2.64B |
| 4 | 32.21B | 2.8% | 14.9% | 4.38B | 623.60M | 3.76B | 2.61B |
| 5 | 33.09B | 2.7% | 15.5% | 4.68B | 624.53M | 4.05B | 2.58B |
| 6 | 33.96B | 2.6% | 15.5% | 4.80B | 624.60M | 4.18B | 2.43B |
| 7 | 34.83B | 2.6% | 15.5% | 4.92B | 623.78M | 4.30B | 2.28B |
| 8 | 35.71B | 2.5% | 15.5% | 5.05B | 622.05M | 4.43B | 2.15B |
Key risks
- Upstream capex downturn hits OFSE volumes and pricing
- LNG project delays or cancellations erode the IET backlog
- Execution and cost overruns on large fixed-price equipment contracts compress margins
Catalysts
- Data-center and distributed power orders for gas turbines turn IET into a durable growth segment
- IET margin progress toward 20% and portfolio pruning in OFSE