ETR Entergy
Good Gulf utility with real data-center growth, but at 3x book it is priced for perfection.
The story
Entergy is a vertically integrated Gulf South utility (Louisiana, Arkansas, Mississippi, Texas, New Orleans) with constructive formula rate plans and an industrial and data-center load growth story that supports high rate-base growth. Trailing ROE of 13.4% is inflated by tax and regulatory items and does not reflect what it can earn over time; the allowed and earned returns on its jurisdictions cluster around 9.5-10.5%. The balance sheet is solid but levered, and hurricane exposure is a recurring risk that securitization softens but does not remove. At about 3.0x book, the market is paying for decades of above-cost-of-equity rate-base compounding.
The facts have not changed since the October take. ROE stays at the earned-allowed level of about 10.5% rather than the trailing 13.4%, which includes non-recurring items. Book growth of about 8% follows the data-center-driven capex plan and fades to 4.5%, below the 5.1% risk-free rate. Beta sits slightly above the 0.55 industry anchor because of storm exposure and capex-funding (equity issuance) risk.
Value drivers
| Return on equity (normalized) | 10.5% |
| Book-value growth (Y1) | 8.0% |
| Terminal book growth | 4.5% |
| Beta | 0.65 |
| Failure probability | 1.0% |
| Cost of equity | 8.0% |
Valuation bridge
| PV of excess returns | 3.71B |
| PV of terminal excess | 10.04B |
| Equity value | 30.36B |
| ÷ shares → per share | $63.54 |
Projected excess returns on equity
| Yr | Book equity | ROE | Excess return | PV |
|---|---|---|---|---|
| 1 | 16.92B | 10.5% | 418.34M | 387.25M |
| 2 | 18.28B | 10.5% | 451.81M | 387.15M |
| 3 | 19.67B | 10.5% | 486.19M | 385.66M |
| 4 | 21.09B | 10.5% | 521.31M | 382.78M |
| 5 | 22.53B | 10.5% | 556.93M | 378.55M |
| 6 | 23.98B | 10.5% | 592.82M | 373.00M |
| 7 | 25.43B | 10.5% | 628.72M | 366.19M |
| 8 | 26.87B | 10.5% | 664.35M | 358.18M |
| 9 | 28.29B | 10.5% | 699.41M | 349.06M |
| 10 | 29.68B | 10.5% | 733.60M | 338.92M |
Key risks
- Major Gulf hurricane causing storm-cost deferrals, equity dilution, and regulatory lag
- Data-center load contracts slipping or being renegotiated, stranding generation capex
- Higher rates compressing utility multiples and raising the cost of funding the capex plan
Catalysts
- New hyperscaler load agreements and rate-base additions approved under formula rate plans
- Constructive rate case and FRP outcomes in Louisiana and Arkansas that confirm earned ROEs near 10.5%